You build a timber border by setting out the line, cutting the turf and trench, treating and fixing the boards, and backfilling so the top edge sits about 25–50 mm above soil level. Timber edging suits straight runs and gentle curves, and the job succeeds or fails on three things: a firm base, drainage behind the boards, and fixings matched to the timber. The steps below assume a low retaining edge of up to about 300 mm and plain sawn or treated softwood boards. Taller retaining walls, or any wall holding back a slope or a structure, need engineered design and are outside what this guide covers.
What you need and the timber to choose
Timber borders fall into three broad types, and the choice changes how you build. Plain timber edging is square-section board, usually 100 × 25 mm or 150 × 25 mm, pinned with stakes. Steel-reinforced timber edging has a galvanized steel channel that the board slots into — the fixing method is push-in spikes through the channel, not timber stakes. Sleepers are thicker section timber, typically around 100 × 200 mm, used where the edge needs mass or a taller face.
For any timber in soil contact, look for durability. Naturally durable species such as oak or sweet chestnut work untreated, though oak is heavy and moves as it seasons. Treated softwood should carry a recognized ground-contact treatment — check the supplier's stated use class or warranty rather than assuming. Tanalised timber sold for landscaping is normally treated for ground contact; confirm the warranty in writing if the border will sit in wet ground.
What to gather before you start:
Timber boards sized to the run, plus spare for offcuts and miters Stakes: 50 × 50 mm or similar, at least the board depth plus 150 mm Galvanized nails, screws, or the channel spikes supplied with a steel edging system String line, line pins, mallet, spade, half-moon edger, spirit level, saw, drill and driver Sharp sand or compacted hardcore for the base, and topsoil for backfill A square face shovel for compaction and a narrow trowel for tidying joints
Spacing rule of thumb: stakes at 600–900 mm centres on straight runs, closer at curves — around 450 mm — and doubled at butt joints. On a curve, short stakes are easier to drive at a slight outward angle so the board's face follows the arc.
Set out the line before you cut anything
Lay the border out dry, with the string line pinned on the outer face, and stand back to check the shape from more than one viewing point. A line that reads well from the kitchen window can look wrong from the patio. On curves, a length of string or a garden hose gives a smoother arc than a series of short straight boards, because every joint adds a kink.
Success check: walk the line at eye level. The board faces should sit plumb and the curve should read as one continuous flow with no visible flat spots. If it doesn't, pull the pegs and re-lay before cutting timber — the fix is free at this stage and expensive later.
Mark the line on the ground with a half-moon edger or spade, cutting a clean slit along the outer face. That cut becomes the reference for the trench: it keeps the top edge tidy when the turf is stripped back.
Cut the turf and trench to the right depth
Strip turf from the border strip and set it aside turf-side down in shade — it re-knits faster than new seed on the backfill. Excavate the trench to a depth equal to the board's buried depth plus the compacted base thickness. For plain edging, a typical specification is to bury roughly a third of the board and stand 25–50 mm proud of the soil, but the governing rule is your board size: calculate from it, don't guess.
Work in short sections, no more than a board length at a time, so soil doesn't collapse back into open trench. Keep the trench width 50–80 mm wider than the board on the garden side; that gap is where you get compaction and drainage, and filling it properly is what stops the edge from leaning.
Two failure cases show up repeatedly here. Cut the trench too shallow and the board sits on loose topsoil, so it rocks after the first wet season. Cut it too deep and box in the base with no drainage, so water stands against the timber and even treated stock breaks down faster than its rating suggests.
If the base fails the check: pull the board up before backfilling rather than after. Re-compact the base in 50 mm layers, check level with the string line and a short spirit level, and only then re-set the board.
Treat the timber before it goes in
Cut ends are the exposed grain that soaks up water first, so brush treatment on every fresh cut before fitting. Use a proprietary end-grain preservative matched to the timber's treatment — the supplier's data sheet will tell you whether the existing treatment is compatible with a brush-on product, and asking first avoids a finish that won't bond.
For plain treated softwood, a coat of end-grain preservative on cut ends and, if you're staining, a breathable finish on the visible face goes on before installation. Don't paint the buried face; film-forming finishes trapped against wet soil fail faster than bare treated timber. If the border sits in permanently damp ground, consider lining the trench sides with a geotextile membrane to keep fine soil out of the drainage layer.
Pin, fix, and level the boards
For plain timber edging, set the first board on the compacted base and drive stakes just inside the garden side of the trench, then fix the board to them so the stake face is hidden behind the timber. On a straight run, fix one end, check level, then work along. On curves, mitre or chamfer joints between boards rather than butting them square, so the outer corner doesn't open up as the timber dries.
For galvanized steel-reinforced edging, the board slots into the channel and the channel is driven in with the manufacturer's spikes. That variant has no timber stakes to level, so follow the maker's install sequence — check on the maker's site for the current spike spacing because it is set by the system, not by this guide.
| Fixing method | Best for | Level tolerance | Check with |
|---|---|---|---|
| Stakes and nails/screws | Straight runs, gentle curves | ±3 mm over 2 m | String line and spirit level |
| Steel channel and spikes | Small radii, low borders | Per maker's spec | Manufacturer's instructions |
| Sleepers on bed and backfill | Mass, taller faces | ±3 mm over 2 m | Level and string line |
Success check: the top edge reads straight or evenly curved along the string line, the board face is plumb, and pushing the top edge with your hand produces no movement and no gap at the base. If it rocks, the base is the cause — not the fixings.
Backfill, compaction, and drainage
Backfill the gap on the garden side with excavated soil or sharp sand in 50 mm layers, compacting each layer with the square face of a shovel or a hand tamper. Fill to within 25 mm of the board top so the edge shows a crisp face. Leave a slight fall away from the timber so surface water runs into the border rather than standing against the board.
On a slope, the timber face needs a small weep path or a gravel strip at the back of taller sections — check the board manufacturer's drainage guidance if the border holds back more than roughly 150 mm of soil. Where the border retains soil, gravel behind the timber and a non-woven membrane stops silt washing into it.
Check success one day later: water the border, then inspect the timber base. If soil has slumped into the trench or the board has settled, lift the affected section, re-compact the base, and re-set — catching it at that stage costs minutes, not a re-dig.
Costs and time: a worked example
Suppose a 20 m straight border with plain treated board 150 × 25 mm, stakes at 800 mm centres, and an afternoon's labour for one person.
Board: 20 m run needs roughly 21 m of board with joint allowance (about 14 boards at 1.5 m, depending on supplier stock). Stakes: 20 m at 800 mm centres is 25 stakes, plus one per butt joint. Fixings: about 60 galvanized nails or screws. Labour: roughly 4–6 hours for one competent person on a straight run, more on curves and where turf removal is heavy.
Example pricing is illustrative, because landscape timber prices vary by species, treatment, and region: for treated softwood board at an illustrative £4–£7 per metre, board alone for 20 m sits around £80–£140, and stakes and fixings typically add a smaller portion of that; naturally durable species such as oak cost substantially more. Get a written quote from your supplier rather than working from any published figure — check current prices before ordering.
Mistakes to avoid on curves and corners
Butting boards square at a curve: a 90° joint opens as timber dries. Mitre the joint or use a small chamfer so the faces meet cleanly. Stake heads left proud: they show through the backfill and catch the mower deck. Drive them below the board top or fix from the garden side. Too-shallow trench with no base: the board sinks after rain. Set the board on compacted base, not loose soil. Painting the buried face: it traps moisture. Leave buried faces breathable and treat cut ends only. Wrong spacing on tight radii: stakes every 900 mm won't hold a 500 mm-radius curve. Tighten to about 450 mm and angle the outer stakes.
When to stop and call a professional
This guide covers low retaining edges. Stop and get a structural assessment if the border holds back a slope higher than about 300 mm, if there is a structure, tree root protection area, or drainage run within the excavation, or if the ground is soft enough that the trench walls won't stand. Retaining walls above a certain height — the threshold depends on your local building regulations — may need approval and engineered design, not a treated board and stakes; check with your local authority's building control before digging. Where a public footpath, boundary wall, or utility sits close to the line, confirm positions with the relevant authority first — a border that shifts a boundary is a legal question as much as a building one.
A final note on the timber itself: durability ratings are guidance, not a guarantee, and ground conditions decide how long a treated board lasts in practice. Look for a stated ground-contact warranty from the supplier, keep drainage working behind the board, and inspect the face every spring — a border that shows a hollow sound when tapped or soft grain at the base is telling you to replace that section early.
FAQ
Can I use untreated timber for a landscape border?
Naturally durable species such as oak or sweet chestnut can work untreated above ground, but any timber in direct soil contact is exposed to moisture and will rot faster than treated stock. For a border that sits in soil, specify timber treated for ground contact and check the supplier's warranty. Untreated softwood is best kept to temporary edges or used with a protective lining.
How deep should I bury timber edging?
A common approach is to bury about a third of the board and leave 25–50 mm showing above soil, but the governing figure is the board section and the ground condition. Set the board on compacted base, not loose soil, and check level with a string line before backfilling.
What's the difference between plain edging and steel-reinforced edging?
Plain edging is a timber board held by timber stakes; steel-reinforced edging slots the board into a galvanized channel driven into the ground with spikes. The steel channel system is easier to set on tight curves and doesn't need timber stakes, but the spike spacing and depth are set by the manufacturer — confirm them on the maker's site.
Do I need planning permission or building control approval?
For low borders up to roughly 300 mm retaining height, generally no, but any wall retaining a slope or structure above that threshold may need approval under local building regulations. Check with your local authority before starting work, and confirm boundary and utility positions with the relevant authority where they run close to the line.